CASE

Sinopec Zhenhai Refining & Chemical

Background of the project

Zhenhai Refining and Chemical Co., Ltd. is the largest crude oil processing base in China, and its DCS and instrument system need to be guaranteed by a safe, reliable and stable uninterruptible power supply.

Product name:AHA、AHP SERIES INDUSTRIAL UPS

Power section/Energy storage time:10~100kVA

上一篇 : PetroChina Yumen Oilfield 下一篇 : CNOOC Qinhuangdao Oilfield
Back to list
185 5902 8961